Tag Archives: worm gear

China S Series Helical Worm Gear Motor Gearbox for Agricultural Machine worm gearbox design

Merchandise Description

S series Helical Geared Motor Traits

one. Functions:

  1. High performance: seventy five%-eighty%
  2. Large technological innovation: the helical gear and a worm equipment combined with an integrated transmission to improve the torque and effectiveness.
  3. High precision: the equipment is manufactured of substantial-high quality alloy steel forging, carbonitriding and hardening remedy, grinding procedure to make certain high precision and stable operating.
  4. Higher interchangeability: hugely modular, serial layout, powerful versatility and interchangeability.

2. Technological parameters
 

Ratio 6.8-288
Enter electricity .12-22KW
Output torque 11-4530N.m
Output speed five-206rpm
Mounting kind Foot mounted, foot mounted with CZPT shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Method Flange enter(AM), shaft input(Advert), inline AC motor enter, or AQA servo motor
Brake Launch HF-handbook release(lock in the brake release situation), HR-handbook launch(autom-atic braking placement)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor protection Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Type S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing substance HT200 substantial-toughness solid iron from R37,forty seven,fifty seven,sixty seven,seventy seven,87
Housing material HT250 Higher energy forged iron from R97 107,137,147,
157,167,187
Warmth treatment technology carbonitriding and hardening treatment method
Single Stage Effectiveness 75%-80%
Lubricant VG220
Safety Course IP55, F class

About Us

ZheJiang CZPT Drive Co.,Ltd,the predecessor was a state-owned navy mould company, was recognized in 1965. CZPT specializes in the full electricity transmission solution for substantial-stop gear production industries dependent on the purpose of “Platform Solution, Software Design and Specialist Support”.
Starshine have a strong specialized force with more than 350 employees at present, including in excess of thirty engineering specialists, thirty good quality inspectors, covering an location of 80000 square CZPT and kinds of sophisticated processing equipment and testing equipments. We have a excellent basis for the market application growth and service of high-conclude speed reducers & variators owning to the provincial engineering engineering analysis center,the lab of equipment pace reducers, and the base of modern day R&D.

Our Staff

Top quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

Application: Machinery, Agricultural Machinery, Dumbwaiter, Sugar Mills, and Kinds of Equipments
Function: Distribution Power, Change Drive Torque, Change Drive Direction, Speed Changing, Speed Reduction, Lower Rotation Speed
Layout: Cycloidal
Hardness: Hardened Tooth Surface
Installation: Oscillating Base Type
Step: Three-Step
Customization:
Available

|